Systems Exam 6 - Seismic Monitoring Flashcards

(7 cards)

1
Q

If OBE is exceeded, whose permission is required to restart the reactor?

A

NRC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If OBE is not exceeded…

A

Maintain Reactor at current power level, as NSSS should still be capable of operating safely.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Seismic monitoring system activates at…

A

0.01g vertical/0.01g horizontal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Safe Shutdown Earthquake (SSE)

A

→0.12g horizontal, 0.08g vertical
→Design Basis Earthquake

Assured:
→RCS Pressure Boundary integrity
→shutdown and maintain safe shutdown
→no offsite exposure in excess of 10 CFR 100

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Operating Basis Earthquake (OBE)

A

→0.06g horizontal, 0.04g vertical
→reasonably expected to occur in plant life
→plant can continue to operate without undue risk to the public if NO seismic induced damage occurs and OBE exceeded light not lit
→otherwise, shutdown required and NRC permission required for a restart

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

TR 13.3.31 Seismic Monitoring

A

→seismic monitoring required at all times
→must be restored within 30 days
→no subsequent actions and 3.0.3 not applicable in TRM (document in corrective action program failure to meet LCO)