TB 70 - Metro Rail Blue Line Flashcards

(198 cards)

1
Q

What metro light rail lines are in the City of LA?

A

Blue line
Green line
Gold line
Expo line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The metro is a mass transit system composed of light and heavy trail vehicles with how many miles of tracks and stations?

A

87 miles, 80 stations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The metro has what 2 heavy rail lines?

A

Red

Purple

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The metro blue line operates in and through what cities?

A

LA, Compton, Carson, Vernon, Long Beach, Florence, willowbrook, and Dominguez hills

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The metro blue line runs from the what in downtown Long Beach to the 7th and flower station in LA?

A

“Loop”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The metro blue line is comprised of how many miles of subway from 7th and flower to the 12th street portal on flower, predominantly at grade?

A

8/10 miles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The metro blue line is supported by emergency fans at which station and an emergency management panel (EMP)?

A

7th and metro center station

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The metro green line route begins west of studebaker road in Norwalk and travels approximately how many miles along the median of the 105 freeway?

A

17 miles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

After the aviation stations for the green line, it splits from the freeway structure and continued south along an elevated right-of-way passing over el segundo and terminates at marine avenue in what city?

A

Redondo beach

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

All of the metro green line stations are elevated except for what cities?

A

Long Beach
Lakewood
Norwalk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What 4 metro green line stations are in the city of Los Angeles?

A

Aviation
Avalon
Figueroa
105 freeway

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The metro gold line currently extends how many miles from

Union station to DTLA, serving LA, south Pasadena, and Pasadena?

A

13.7 miles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which metro line passes over bridges (arroyo seco and LA river), tunnels (Figueroa, Colorado, and walnut), and through U-cuts (210 freeway)?

A

Metro gold line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Where is the 1 elevated station for the metro gold line located?

A

In Chinatown

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Where are the 6 subway stations located for the metro gold line?

A
Memorial park
Coloarado
Marengo street in Pasadena
Figueroa
First
Flower
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Where are the 3 U-cut stations for the metro gold line located?

A

Lake
Allen
Sierra Madge villa

All in Pasadena

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Where does the metro gold line being it’s underground (subway) operation?

A

Over the bridge to Clarence street

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Where is the last station for the gold line located?

A

Atlantic boulevard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Phase IIA of the metro gold line foothill extension is how many miles long and will travel through 11 cities through the San Gabriel valley?

A

24 miles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

The metro gold line will be constructed in 2 segments, phase IIA (east Pasadena to Azusa) and IIB (Glendora to Montclair) have a projected revenue operating date of what year?

A

Phase IIA: 2016

Phase IIB: 2020

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

The metro expo line phase I connects DTLA with Culver City and is how many miles long?

A

8.5 miles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

The metro expo line phase II will extend how many miles from

Culver City to the 4th street/Colorado boulevard in downtown Santa Monica with a projected ROD of 2016?

A

6.6 miles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

The what is a tunneling project that will provide 3 underground stations at 1st/central ave, 2nd/broadway st, 2nd/Hope st connecting the gold line to the 7th st/metro center in DTLA?

A

Metro regional connector transit corridor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

The metro Crenshaw/LAX line will extend from the existing metro expo line at Crenshaw and will travel how many miles to the metro green lines aviation/LAX station?

A

8.5 miles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
The light rail consists of track and stations that are fed electrically by a what as opposed to a 3rd rail system like the red/purple line?
Catenary system
26
What high voltage AC feeders enter into traction power substations (TPSS)?
34.5 kv
27
The 34.5 kv AC is converted by a transformer/rectifier to what voltage DC and fed through the pantograph via catenary lines in order to operate passenger vehicles?
750 volts dc
28
At no time shall any object or person come anywhere near the catenary line without what?
Prior (proper) authorization
29
The entire what should be considered energized at all times?
Catenary system
30
Emergency blue light stations have what to de-energize the catenary lines?
“Mushroom” buttons
31
What is located at all TPSS, cross passages, elevated stations, and remote access points, end of all below-grade level station platforms?
Blue light stations
32
If time permits, call who first to de-energize catenary system?
Rail operations control (ROC)
33
What does not weight less than heavy rail cars but often weigh more?
Light rail vehicles (LRVs)
34
The metro light rail trains follow what which are dedicated rail routes that are at grade, on elevated guideways (tracks), in tunnels, or in U-cuts?
Right-of-ways (ROWs)
35
Typically the light rail vehicles on all lines travel on two parallel tracks on the what side of the road like our motor vehicle traffic?
Right side of the road
36
It is important to know that the metro authorities may decide to what which means the trains may be traveling on an uninvolved track from both directions?
“Single track”
37
These stations are substantially level with the surrounding topography?
At-grade
38
The vast majority of “trains vs auto” incidents occur at what section of the guideway?
At-grade
39
What stations and tracks are higher than the surrounding area, it allows train and motor vehicle traffic to flow unimpeded?
Elevated
40
What stations and tracks are below grade and naturally allows both train and motor vehicle to flow unimpeded?
Tunnel
41
What stations and tracks are transitional sections of the guideway that take it from tunnels to at-grade or elevated sections?
U-cut
42
Whether the light rail track is at-grade, in a tunnel, at a station or on an elevated structure it will be near what kind of marker?
Mile marker
43
Milepost markers are used throughout the rail and network and are marked not to exceed distances of more than how many miles?
1/10 mile
44
What comprises the majority of the light rail system?
At-grade stations and guideways
45
All stations and guideways in the city of LA are provided with what consistent with local codes?
Water supply (hydrant or standpipes)
46
There are no what installed in at-grade stations located in the city of Los Angeles?
Standpipes
47
Which light rail tunnel stations are the only ones with automatic wet standpipes?
1st street tunnel and flower street tunnel
48
What type of standpipe do the rest of the light rail tunnel stations have?
Manual wet standpipe system
49
What standpipes have a ready source of water with sufficient pressure to apply an effective stream?
Automatic wet standpipes
50
What standpipes are ineffective until FD engines can augment the system through FDCs?
Manual wet standpipes
51
Hose outlets in the light rail tunnels are located between how many feet apart?
250’ and 300’ apart
52
Wet standpipe outlets are found where?
Along emergency walkway Out of the ground The wall Lateral feed main
53
Lighting is provided with a minimum of how many minutes battery back up supplied through an uninterrupted power supply (UPS) inverter?
90 minutes
54
Blue light stations give the fire department what abilities?
Ability to communicate with ROC | De-energize the rail in that segment
55
Emergency walkways have a width of at least how many inches?
30 inches
56
Antennas installed allow clear FD radio transmission/reception on what 8 channels and accessed through the “repeat setting” which are the same in the red/purple line?
2, 4, 6, 7, 12, 15, 16, 17
57
Cross passages in the light rail system are located about every how many feet through the tunnel?
750 feet
58
The what is used for the transfer of passengers (or emergency responders) from one bore to another?
Cross passages
59
The red exit exist signs will identify each what?
Cross passage
60
In the world of subway tunnels, an exit sign lead to a point of what?
Safety
61
What hatched mount flush with the sidewalk and are secured from the inside with panic hardware similar to those on the red/purple line?
Exit hatches
62
To access the exit hatches and open them, they require what tool?
Spanner
63
Each blue light station contains what?
Emergency trip station (ETS) box with “mushroom” button Emergency telephone (ETEL) with automatic ring down to ROC
64
The water system at tunnel stations will be fed from 2 separate mains (looped) and can be shut off from main valve located where somewhere in proximity to FDCs?
Pits
65
Every how many feet throughout the tunnel, 2 1/2” outlets are provided at track level and at all cross passages?
250’-300’
66
The FDCs to each station are around where of the main entrance?
Address side
67
Sections of tunnels can be isolated from what rooms located at the end of each station at track level and/or various cross passages throughout the light rail tunnels?
Tunnel valve rooms
68
You can isolate wet standpipes and sprinklers on one side of the station from the other side with sectional valves located where under the platform refuge area on the outbound (right) side of the station?
Midway track level
69
Fire hose cabinets will be distributed throughout each station and are outfitted with what?
100’ of 1 1/2” rubber line hose and spray nozzle 2 1/2” FD outlet 40 BC dry chem or CO2 extinguisher
70
What is installed at track level at each station for the event of an under-car fire?
Under-car deluge system
71
The who will always attempt to get the attempt to get the train to the station and activate the deluge system?
Train operator
72
The deluge system is activated by depressing a button located at each what at the end of the platform which will also de-energize the over catenary line in that section?
Blue light station
73
Light rail enclosed system stations, system underground or enclosed train ways greater than how many feet are equipped with emergency ventilation fans?
1000 feet
74
Emergency ventilation fans work in various configurations based on what?
Train location Passenger evacuation direction Fire department access location
75
The what are similar to annunciator panels, indicating location (zone), nature of the alarm, status of ventilation fans (light rail tunnels over 1,000 feet), recall the elevators, and stop the escalators (downward flight only)?
Emergency management panel (EMP)
76
Communication functions available at the EMP include what?
Public address system (whole station or individual zones) | 2 land lines
77
Any outside line can be reached at the EMP by first dialing what?
9
78
All light rail tunnel EMPs are located where?
Concourse (mezzanine) level | Outside station entrance at street level
79
For the EMP, the exception to the rule for the location is the what where it is located in the fire control room at track level?
East portal transitional structure
80
The only subway station for the blue line is located where?
7th and flower
81
Normal access and exit points to the large subway tunnel/station are located at what building on 7th and Figueroa and what building at 7th and flower?
Ernst and young building: 7th/Fig | Los Angeles community college building: 7th/flower
82
The emergency exits for the blue line are located along flower from what’s streets?
7th to 12th street
83
The emergency hatches are spaces approximately how many feet apart throughout the length of the blue line tunnel?
800 feet
84
A blue light station is located at the end of each what at the 7th and flower station?
Platform
85
There are no what in the flower street tunnel?
Cross passages
86
2 1/2” outlets are provided at track level every how many feet and include an audio jack for sound powered phone?
250’
87
What is the TC and C room?
Train control and communication room
88
The TC and C room contain what kind of fire protection system?
Halon system
89
The DWP power vault is equipped with what type of fire protection system?
Fire detection system only
90
The configuring of ventilation fans is all done at where and if necessary local fans can be activated from the EMP?
ROC
91
A sound powered emergency telephone will provide communication between the EMP and what?
Station command post locations FDC inlets All 2 1/2” outlet locations
92
The gold line tunnel located in Pasadena is approximately how long from end to end?
400’
93
Other than the Chinatown aerial and 101 freeway aerial guideways, all aerial structures on all light rail systems what what type of standpipe systems?
Wet standpipe
94
Hose valves on aerial guideways are usually located between how many feet apart?
250’-300’
95
At elevated stations, hose valves are usually at or near ends of platforms and not greater than how many feet apart?
200’
96
Emergency lighting for elevated structures have a minimum of how manny minutes of battery back up?
90 minutes
97
The light rail vehicle is an articulated (flexible in center) how many axle rail car?
6 axle
98
The light rail vehicle has an operating cab at each end allowing for what type of movement?
Bi-directional
99
The ends of a light rail vehicle are referred to as what ends?
“A” and “B” ends
100
Which end of the car has the point of attachment for the pantograph?
“A” end
101
The light rail vehicle run is how many car arrangements?
Single, double, or triple arrangement
102
Each light rail vehicle car is how long and how wide?
90’ long, 9’ wide
103
Each LRV car is how tall?
11 1/2’
104
When the pantograph is fully extended the LRV is how tall?
23’6”
105
The clearance underneath the car from floor of car to railroad bed is how many inches?
39”
106
What is the max capacity of each car for passengers?
237 passengers
107
When the cars are filled to capacity, how many passengers will be standing and how many will be seated, leaving room for 2 additional wheel chair passengers at each end?
157 passengers: standing | 76 passengers: seated
108
For the wheel chair passengers, their location is at each end of the car directly behind who?
Operators cab
109
How many double sliding doors are on each side of the LRV?
4
110
What are the measurements for the double sided doors?
6’6” tall | 4’ wide
111
Interior emergency door releases are located over each passenger door, they are mounted in the cars ceiling and readily identified by a sign that reads what?
Emergency door release
112
The “emergency door release” sign is adjacent to an opening that exposes a red what?
“T” handle
113
When pulling down the “T” handle, it will relieve air pressure from the latch mechanism allowing door to be manually opened, how long of a delay will occur before doors can be opened?
4-5 second
114
The EXPO alignment will operate with all of the various existing LRV types, which are?
``` P-2000 P-865 P-2020 P-2550 P-3010 ```
115
For the old LRVs, to access the emergency door release panel from the outside, insert what into the keyhole and depress?
Pen or pencil
116
To access the emergency door release panel on the P-2000s, do what with the compartment cover by hand to access handle?
Lift compartment cover
117
All interior and exterior windows are made of what material?
Polycarbonate (Lexan)
118
Entry to the lexan windows in the car may be gained by using or doing what?
``` Rotary saw (carbide tipped blade) Removing the weather stripping around window ```
119
On the P-2000s, lift the small cover to access red emergency door release handle and lift handle, the crew door will open approximately how many inches?
2-3 inches
120
For the P-2000s, if the car doors are not positioned on a passenger platform, use what steps to board the LRV?
Loop steps
121
Once inside a P-2000, to open the other 7 doors, located above each set of passenger doors is a red colored rotor switch, turn rotor switch in what direction and how many turns?
Clockwise, 1/4 turn
122
Another option for opening crew doors in all LRVs is with what through a smaller door cover plate adjacent to cover plate of red handle?
Barrel key
123
For all LRVs types, use the barrel key (xx-4245), it will open the door completely by turning into position, the train must have sufficient air pressure and what DC battery power to operate?
37.5
124
“T” keys are distributed to the FD by metro to access what on all types of LRVs?
Compartment doors and access panels
125
The xx-4245 barrel key is distributed to the FD by metro to access what on all types of LRVs?
Train operators crew cab door
126
For the P-865/P-2020 LRVs, on the rightside front end move the flap up to expose a key hole operate the “T” handle to open the adjacent double set of passenger doors opposite the train operators seat, the cover plate will “pop” open with what tool?
“T” key If no “T” key use pen, pencil, or 3/8” Allen wrench
127
For the P-865/P-2020, if you require additional access to the LRV once inside, the what located above each passenger door when pulled down will open the doors?
“T” handles
128
For the P-2000, additional access through large passenger windows is very difficult because the windows are what?
Glued and laminated
129
For the P-865/P-2020, alternative means of access through larger windows can be accomplished by pushing upward at base of windows rubber seal with a larger what to disengage window?
Large screwdriver
130
For the P-2550, to gain access to the car from the outside, lift the cover plate adjacent to passenger door, and then lift what to open door?
Red emergency door release handle
131
For the P-2550, if you require additional access once inside the LRV, simply lift the red colored emergency door release handle located where?
Next to each passenger door
132
For the P-2550, for additional access through larger windows, use a large what in the center of the black colored window seal prying out the zipper to remove window outward?
Screw driver
133
How many minutes will a take a fire to burn through the floors of all LRVs?
60-90 minutes
134
Light rail lines are powered by 750 volts DC through the overhead catenary system supplied by traction power substations (TPSS) located along the railways at what mile intervals?
1 mile
135
The ETS push button should be used only if you do not have the ability to contact who and time is critical?
ROC
136
All LRVs have cameras looking forward at each end of each car and 2 cameras for what sections of the LRV?
“A” and “B”
137
The DVRs for the cameras store information approximately how many days depending on the usage of in-device hours of the LRV?
5-6 days
138
When requested by first responder or rail management, the rail division manager can request who to download the information from The DVD?
Rail fleet services (RFS)
139
Cameras on the LRV have only what capability of recording?
Video
140
When arriving to a metro rail incident, the first in company should request thru MFC, that ROC have the train operator lower what on the roof of the LRV to remove the 750 DC power from the OCS to the LRV?
Pantograph
141
Each LRV has a pantograph located on the roof of which car?
“A” section of the car
142
A train can operate a single 90’ LRV or couple 2 LRVs resulting in 180’ containing how many pantographs?
2, 1 on each “A” section of each LRV
143
What is the maximum operating length of a train resulting in what length and how many pantographs?
3 cars, 270’, 3 pantographs
144
For some emergency situations, the pantograph may become entangled in the OCS, who should be contacted to de-energize the OCS area of the entanglement for firefighter safety?
ROC
145
What is the number for ROC blue line?
(323)563-5022
146
The pantograph is extended less than how many pounds of spring pressure and can be lowered electronically by the operator or manually via foot pump?
22 pounds
147
Where is manual foot pump located to lower the pantograph?
Second forward facing seat left side of “A” section
148
When manually lowering the pantograph listen for the lock to what?
“Click”
149
The overhead catenary system contains 3 components, what are they starting from top to bottom?
1. Messenger wire 2. Hanger 3. Contact wire
150
The height of the overhead catenary system varies from what height?
18’ to 22’
151
What key should be used to open the train operators cab door?
XX-4245 barrel key
152
If the first responders are not in possession of a xx-4245 barrel Key, how should you gain access to the train operators cab?
Break the operators cab door window
153
First responders can electronically lower the pantograph by turning the switch or moving the toggle switch to the what position to lower all pantographs simultaneously?
“Lower pantograph” position
154
When lower the pantograph what gets shut down?
AC Unit and reduction of passenger compartment lighting
155
If 1 pantograph is up and there others are lowered, will the other LRVs that are coupled be energized?
No
156
If pantographs cannot be lowered from operators cab due to damage, remove master key from switch and walk to opposite end of trains and place key to what position to lower pantograph with switch or toggle?
Local or on position
157
For the P-2000, to manually lower pantograph, access hand crank from where?
Behind 3rd upper compartment behind train operators seat on “A” section of LRV
158
To access hand crank from compartment on the P-2000, use what key?
“T” key or 3/8” Allen wrench
159
For the P-2000, once equipped with hand crank, adjust hand crank to cranking position and walk to the “A” section of the LRV, look for what opening on the ceiling and apply pressure while cranking in direction indicated on rubber molding where crank is inserted?
A black hole
160
How long should you wait to work on the roof area of any pantograph after it is lowered do to the capacitors?
5-15 minutes
161
Where is the foot pump located for the P-865/P2020 LRVs?
Under second forward facing seat of the “A” section of the car
162
For the P865-/P-2020, to unlock cabinet containing foot pump, use what key?
XX-4245 barrel key
163
For the P-865/P-2020 LRVs, after placing the foot pump on the floor and placing the switch from normal to lower begin to pump for approximately how many pumping motions until pantograph is down?
20-25 pumps
164
You will hear what on the roof when the pantograph is lowered?
Thud
165
For the P-2550, the hand crank is located where?
Behind the seat in the train operators cab in the “A” section
166
For the P-2550, to manual lower the pantograph place the hand crank where and turn in the direction indicated on the rubber molding where hand crank is inserted?
Black hole
167
After the pantograph has been lowered, the LRV maintains what voltage DC battery power for interior lighting, doors and unit for raising and lowering pantograph?
37.5 volts DC
168
Where is the battery located for the P-2000?
Right side of “B” section identified with decal “battery disconnect”
169
Where is the battery located for the P-865/P-2020?
Under the cars right side, behind a skirting on the “B” section
170
Where is the battery for the P-2550?
Right side of “B” section with no decals
171
Some of the equipment on all types of LRVs can generate how many amps?
40-60 amps
172
What type of batteries do all types of LRVs have?
Nickel cadmium
173
When disconnecting the batteries on all types of LRVs, do not disconnect batteries until after what?
Pantograph has been lowered
174
Braking resistors on the pantograph can be between what degrees?
400 to 500 degrees
175
Is the metro blue line at the 7th/flower station and 12th/flower portal supported by fans?
Yes
176
Where is the EMP located for the 7th/flower and 12th/flower portal?
7th and metro center station
177
Does the metro green line have underground sections?
No
178
Is the east side tunnel metro gold line (mariachi/Soto/east portal) supported by fans?
Yes
179
Where is the EMP located for the east side tunnel?
East portal EMP
180
Do the Figueroa box and Marengo box structure metro gold line have fans?
No
181
Is the metro expo line exposition box structure (USC/exposition) supported by fans and EMP?
Yes
182
Is the metro Crenshaw/LAX line Aviation/century station supported by fans and EMP?
Yes
183
Who determines if fan support is required to mitigate smoke and initiate pre-designated emergency ventilation scenarios?
ROC
184
For above ground LRV incidents, MFC will dispatch what resources to the assignment?
``` 1 BC 2 LFs 1 engine 1 EMS captain 1 heavy rescue 1 ALS RA ```
185
For a red/purple line incident, MFC will dispatch what resources to the assignment?
``` 3 TFs 1 engine 1 heavy rescue 1 BC 1 EMS 1 squad 1 ALS RA 1 ALS engine ```
186
Who will respond to act as the on-scene coordinator for the ROC and fire department?
Rail transit operations supervisor (RTOS)
187
The LRVs have a minimum speed of what on shop tracks or 90 degree curves on city streets?
5 mph
188
What is the maximum speed of the LRVs?
55 mph
189
The LRVs will take approximately how many feet to stop going at 55 mph?
800’
190
If the need arises to warn or stop oncoming rail traffic, members can consider the use of flares or red flags spaced approximately how many feet in both directions from the incident?
800’
191
Allow how many feet of clearance between yourself and LRVs in case of sudden movement?
10’
192
This subsystem shall serve employees and emergency personnel with emergency communications from trainways and at trainway equipment locations and areas removed from public areas?
Emergency telephone (ETEL)
193
What is located at BLS only in the blue line and red line (segment 1) tunnels used for point to point communications for tactical emergency operations and considered an antiquated system?
Fire telephone (FTEL)
194
Where is ROC located?
2000 East Imperial Hwy, Los Angeles 90059
195
What level of a station includes power, communication, mechanical and operational control rooms and protected by automatic fire protection systems?
Ancillary level
196
What level of a station is public area and is designed to facilitate fare collection?
Concourse (mezzanine) level
197
What level of a station is designed for rapid movement of patrons to and from vehicles?
Platform level
198
What is an isolated portion of the metro rail track which serve as temporary storage or repair sites for metro rail cars?
Tail track