What years were HI-RI required to have a fire tower?

A

1938-1968 *does not mean they have them

PS. before 38 some have fire towers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

T/F HIRI Building evacuation supervisor is needed when 100 people above/ below street level or less than 400 people entire building.

A

False

less than 500 people in entire building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

T/F HIRI core construction is when building systems are grouped together in the center of the building.

A

False
it can ALSO be on one of the sides
Center/Side Core

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

HIRI are curtain walls bearing?

A

no

non-bearing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is an elevator door vane?

A

CONNECTION between elevator car door and hoistaway door.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

HIRI what is considered the fire sector?

A

fire floor and floor above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

HIRI what is the typical size and how many stairways?

A

200x400
6 stairways on lower floors
3 or more on upper floors
PS others have ONLY 2 from lobby to roof

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the minimum height to be considered a

HIRI?

A

75 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

HIRI for primarily for transacting business will fall under what class?

A

Class E also public/civic services fall under “E”

Limited stock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

HIRI falls into 3 types of construction and what are their years?

A

heavy before 1945
medium 45-68
light after 68
PS just remember the middle #’s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

T/F HIRI heavy weight construction u would find plenum?

A

No plenum

No core

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What type of HIRI building has steam heat, no central AC and exterior windows do open?

A

Before 45 Heavy Weight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

HIRI, what type building has lack of compartmentation

A

Light weight after 68

PS used spray on fire proofing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In light weight HIRI buildings there is a major flaw what is it?

A

6”-12” space in exterior walls which requires add.

fire stopping.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Where would u find extensive plenums in HIRI?

A

Light weight (after 68) and lack fire stopping

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What type building would u find extensive core construction?

A

HIRI after 68. Light weight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

HIRI. HVAC has 2 general categories?

A

Central- most common,air to more than 1fl.

Non-Central-serves the floor where equipment is

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

HVAC are divided into 3 sub-systems?

A

processing equipment
supply
return

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

On the HVAC where would u find the smoke detectors?

A

on the returns

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

HVAC. What is the room called where they process the air?

A

MER

Mechanical Equipment Room

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

HIRI Will we find one HVAC unit serving the whole building?

A

NO

We usually find a group # of HVAC’S each supplying a group of floors (supply zones)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

HIRI. There are 4 places u find Fire Dampers?

A

supply ducts meet supply shaft
pass through a rated partition
air enters RETURN from plenum on each FL.
RETURN air passes a rated partition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Is return air in the plenum ducted?

A

no

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

If the HVAC is not turned off automatically, manually shut which side the supply or return?

A

Both

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
T/F In some HVAC systems the smoke detectors only shut down the return side?
False supply side | u have to manually shut the return
25
Place the HVAC in the non circulating mode: _____ all outside air dampers. _____ all mixing valves _____ all exhaust dampers
Open Close Open PS everything to the outside we open up
26
T/F After we determine the fire floor turn on the SUPPLY to HVAC, to the building except the floor where the fire is?
False do not turn on the FIRE AREA. ? i assume they mean the floor above also?
27
HVAC has fusible links that are rated approx. ____ | above Max normal temps.
50 degrees
28
T/F HVAC Once a fire damper closes it must be Manually opened.
True
29
T/F Local Law #5 requires product of combustion ionization device OR a COMBO of approved smoke detecting device AND fixed temp thermostatic device.
true | PS these devices are located on the return on each fl. activation shall stop air into and leaving floor
30
Manual fire pumps for the1938 building code the height would have to be?
Over 250' PS 1968 over 300' pumps got better with time that is why they go higher in the later years!
31
Pump rooms are normally located where?
on the Lowest floor | cellar or sub-cellar
32
Pump room bypass is located on what side of the fire pump?
Discharge side
33
AS we know bypass valve should be closed position, if not still start pumps. on a 8" riser loss would be ____% on a 6" riser loss would be ____%
25% 45% These #'s are with bypass open
34
Control Cabinet for fire pump are in the shape of a large cube, size varies from ________.
``` 6x6x6x 8x8x8x (older models) ```
35
How do u start fire pumps? PS if pumps fail to start then use Emergency Power Lever. push or pull
``` ACRO: kansas city starters suck close KNIFE switch to "ON" position close CIRCUIT breaker& power on push START button& pump on move SELECTOR LEVEL ```
36
Recommended pump pressures start at?
150 psi for floors 1-10 and increase by 50psi every 10 floors PS the ECC will be the member operating pumps if no engineer
37
Pump capacity is usually_____ and most have 2 pumps that are connected in the parallel position.
750gpm | PS keep both pumps around the same pressure
38
T/F Most buildings have 1 manual and 1 automatic fire pump?
False Most have 2 manual. Some have 1 manual 1 automatic
39
T/F If there is 2 manual pumps start both?
true | each will have its own control panel
40
Fire pumps should be able to deliver a pressure of | ____ psi at the highest floor outlet?
50psi
41
Fire pump relief valve is required to be set to ____psi above the highest floor outlet.
15 psi
42
Primary water supply in HIRI is?
in most operations will be FD engines
43
In HIRI what is the Rule of Thumb when talking about water supply?
separate engine supplying system for each handline in operation
44
HIRI CFR engine takes what tools?
All CFR equipment and forcible entry tools
45
T/F A 2nd alarm is transmitted for visible fire OR smoke coming through the skin of the building or when a serious fire verified?
true
46
``` What is the location in a HIRI of these ladders 1st 2nd 3rd 4th ```
1st/2nd fire fl 3rd floor above 4th operate on upper floors/search attack stairs
47
HIRI What is the preferred method of evacuation of people?
Fire tower if they have one.
48
HIRI 2nd line is used to?
reinforce/protect 1st line. protect search/evacuate fire fl. contain/confine/prevent fire from wrapping around core.
49
HIRI During a fire initially what floors need o be evacuated?
Fire Sector
50
HIRI, The time of the day will affect what?
ACRO: SRO status of building systems response times occupancy load
51
``` ICS NOTE Who reports to who, put in proper order: Supervisors Directors Leaders ```
Acro: DSL Directors Supervisors Leaders
52
HIRI Fire sector supervisor will communicate with his units on what HT channel? SAE group will communicate with his units on? FSA manager will communicate with his units on?
Primary tactical Secondary Tactical Command Channel
54
HIRI Where is the location of Forward Staging Area?
USUALLY 2 floors below Fire
55
HIRI The lobby control unit what is there main purpose?
Recall,control,operate elevators. Search elevators that TERMINATE IN LOBBY Control access points,direct personnel&occupants
56
HIRI What is the main purpose of the systems control unit?
monitor communications system,HVAC and other systems.
57
HIRI Who is in charge of transporting equipment by elevator or stairs?
High Rise Support Unit | PS will report to Forward Staging Area
58
HIRI, Where is the staging area located?
OUTSIDE away from the building do not confuse this with the forward staging area.
59
HIRI, Who is usually located 3floors below the fire?
Forward Triage Area
60
HIRI, Where is the Search&Evacuation located?
2 floors above the fire
61
HIRI, How many units will be stationed at the Forward Staging Area?
AT LEAST 3 engines 2 trucks | PS. 20 scba's
62
HIRI, If Officer leaves the ICP who would be the preferable member to command the post?
1st LCC
63
HIRI, What does an engine company report to the forward staging area with?
ACRO: MESH mask& extra cylinder per member standpipe kit & nozzle Length of Hose per FF
64
HIRI, What does the ladder company report to the forward staging area with?
Acro: METS Mask& Extra cylinder per FF Two sets of forcible entry tools& 6'hooks Search/utility ropes
65
HIRI, When encountering a fixed stairwell pressurization system, Should it be turned off or on?
ON | Do not augment with PPF"s enter in CIDS
66
HIRI, When can natural vertical vent start?
Once the fire has been extinguished. | Doors at the bottom and top will be opened
67
HIRI, When does "Stack Effect" becomes noticeable in buildings? (height)
OVER 60 | increases as height of building increases
68
Positive stack effect increases as ______ air temp decreases in relation to _____ temp.
outside | inside
69
Negative Stack occurs when outside temp is above____?
ABOVE 90 degrees | Cold weather is good for us.
70
HIRI T/F Doors at the top must be opened to get the greatest effect of the stack effect?
False | top and bottom
71
HIRI,Can Fire Towers be used as the attack stair?
Not Recommended
72
HIRI, Who ensures the Attack is clear of occupants for at | least 5 floors above the fire?
Fire Sector Supervisor would be an officer at 1st but the 2nd BC takes over.
73
HIRI, Who advises the IC as to the need and placement of 2nd line?
Fire Sector Supervisor
74
HIRI, Where is the Fire Command Station located?
In lobby near elevator control panel
75
HIRI. Where do u find loud speakers?
all floors all elevators all stairway enclosures
76
HIRI, 2 way comm between the fire command station and Who?
``` ACRO: WAMEE Warden Station Air Handling Control Rooms Mechanical Control Center Elevators& Elevator Machinery Rooms ```
77
HIRI, Floor Warden Station is on each fl.between the exits. What does it consist of?
Phone type handset visual & audible @ fire command station 2-way voice communications with fire command station. make announcements on that floor door painted RED and says "fire emergency-open door to operate"
78
HIRI, Manual Fire Alarm stations installed so no point on any floor is more than ______ ft away
200
79
HIRI, Activation of Manual Fire Alarm Sending Station will Cause?
automatic tran to FD Visual&Audible@ fire command station,MCC and regularly assigned location of Fire safety Director. Alarm on FIRE FL. and FL. ABOVE
80
HIRI READ 7.2.5 & 7.3.1
READ
81
HIRI T/F Activation alarm in HVAC does everything except the recall of the elevator
True
82
HIRI, What would u use to establish hard wire comm between ICP and various fire sectors?
Warden telephone system
83
HIRI. Where would u find 2 way communication?
Elevators Fire pump room Air handling control center Mechanical Control Center
84
HIRI, What are 1st ALARM general goals?
control elevators, locate fire fl and best access S&E of fire SECTOR RECON OF EXTERIOR Initiate search of uppermost floors& all stairways (especially Attack)
85
HIRI, 1st arriving ladder company gets what info from Fire Safety Director? IMPORTANT!
``` ACRO:AFEE ACCESS Stairs serving fire fl location of FIRE EVACUATION procedures ELEVATOR status ```
86
HIRI, 1st arriving ladder PRIOR to leaving lobby MUST do? | IMPORTANT!
``` ACRO: FAME get FLOOR PLAN (if more than 1 copy) ACCESS stair keys MAN ICP fire area ELEVATORS in fireman service ```
87
HIRI, Due to HVAC and the stack effect smoke can permeate the entire zone up to _____ floors.
25
88
HIRI, Who performs prelim inspection of the exterior?
LCC
89
HIRI 1st to arrive ladder upon arrival at floor BELOW fire relays what info to ICP? IMPORTANT!
``` ACRO: F-SHLAP Fire fl Stairway with Standpipe Heat/Smoke Life Hazard Advancing Engine Primary Search ```
90
HIRI, Where does 2nd arriving ladder company go?
fire fl to assist in search and evacuation.
91
HIRI, Does the 2nd ladder use the same elevator as 1st ladder?
If possible yes. | If another is used staff with HT member and operate until relieved.
92
HIRI, Where does 3rd arriving ladder go to?
floor above fire. try to take elevator that is already in fireman service so not to lose a member
93
HIRI. 3rd truck takes what stairs to get to the fl above?
not the attack stairs
94
Who determines what stairway for the occupants to take for examination AND EXAMINES ALL stairways and informs ICP?
3rd Arriving truck
95
HIRI, 3rd arriving ladder will examine the fl above fire and report to the ICP what?
``` ACRO: FACE FIRE extension ACCESS stairs CONDITIONS Heat/Smoke EVACUATION Status ```
96
HIRI, 3rd truck is having problems clearing the attack stairs who do they notify?
1st arriving truck COMPANY | Fire sector supervisor/ Fire branch director
97
HIRI, Who performs Primary searches on the fl above the fire?
3RD truck
98
T/F Notification of missions accomplished is very important to the IC?
False | missions NOT accomplished.
99
HIRI, Who brings an extra cylinder into the building, 1st 2nd or 3rd due?
none of them
100
HIRI, 4th truck what are there primary objectives?
Roof Ops | primary search of TOP 5 Floors
101
HIRI, Does 4th truck report in with a extra cylinder per FF?
Yes
102
HIRI, How does 4th truck get to the roof?
Blind Shaft Elevator or Stairway other than attack
103
HIRI, 4th truck gets to the roof area shall report what info to the IC? IMPORTANT!
``` ACRO: COW VU Conditions in stairs Occupants WINDOWS any fire/occupants visible from roof Ventilation Unusual conditions ```
104
HIRI, After roof Ops for the 4th truck. What would be they do?
Upper floors of elevator bank serving fire floor.
105
HIRI, Greater alarm and special called ladder/engine report where?
ICP in lobby or lobby control unit or staging area outside building in this order!
106
HIRI. What info does the 1st arriving engine get from FSD? | PS remain at ICP until 1st ladder verified location
``` ACRO: AFEE ACCESS stairs serving fire floor Location of FIRE EVACUATION Procedures implemented ELEVATORS Status ```
107
HIRI. 2nd arriving engine officer main task is what?
Provide communication link with Post radio to lobby and fire area until sector/branch established. Be in vicinity of standpipe of 1st line.
108
HIRI. When does the 2nd engine officer leave the standpipe outlet?
once correct nozzle pressure is supplied.
109
HIRI T/F The 2nd engine stays with the 1st line once it is stretched and operating?
False leave once this is done, to conserve air.
110
HIRI. 3rd/4th engines 2nd hoseline is there for what reasons? PS directed by fire sector supervisor/IC
Reinforce 1st line protect position of 1st line protect and search evacuation of fire fl contain/confine from wrapping around core
111
HIRI. Can greater alarm engines be used to assist in search of upper floors?
Yes
112
HIRI. T/F grater alarm engines can not be used to transport special tools /equip to the FSA.
False
113
HIRI. Units with no specific orders shall bring SCBS, Rolled up lengths and spare cylinders to ______.
lobby area
114
High Rise Office Buildings | Building built before this date are considered HEAVY WEIGHT BUILDINGS?
Before 1945
115
High Rise Office Buildings | Building built between these YEARS required FIRE TOWERS?
Built between 1945-1968
116
High Rise Office Building | Building built after these year have a LACK of COMPARTMENTATION,built on "Q" decking FLOORS and have PLENUM CEILING?
Built AFTER 1968
117
High Rise Office Building Class E Built AFTER 1968
``` Lightweight building 8-10 lbs /cubic ft HVAC system CORE construction "Q" Decking Floors Plenum Ceilings LACK of COMPARTMENTATION FIRE tower NOT REQUIRED Exterior WALLS are CURTAIN WALLS (glass n metal) Exterior WINDOWS USUALLY NOT OPENABLE ```
118
High Rise Office Buildings Class E Built BEFORE 1945
``` HEAVY WEIGHT building 20-23 lbs cubic ft STRUCTURAL STEEL encased in CONCRETE/ MASONRY WALLS tied to FLOORS FIRE TOWER not required UNTIL 1938 No CORE CONSTRUCTION No CENTRAL A/C usually EXTERIOR WINDOWS open ```
119
High Rise Office Buildings Class E Buildings built btween 1945-1968
MEDIUM WEIGHT building 10-20 lbs cubic ft FIRE TOWERS REQUIRED mix of pre 1945 buildings n 1968 characteristics
120
High Rise Office Buildings | What AREA is located TWO FLOORS BELOW the fire?
FORWARD STAGING AREA
121
High Rise Office Building | Where is the FIRE SECTOR located?
FLOOR BELOW the FIRE
122
``` High Rise Office Building Where are these POST/SECTORS/GROUPS located? ICP FIRE SECTOR FORWARD STAGING AREA FORWARD TRIAGE UNIT SEARCH&EVAC GROUP ```
LOBBY (ICP) Floor BELOW the FIRE (FIRE SECTOR) TWO floors BELOW the FIRE (FORWARD STAGING AREA) BELOW the Forward Staging Area (FORWARD TRIAGE UNIT) ``` FLOOR not served by an ELEVATOR serving FIRE FLOOR & At least 5 floors ABOVE the FIRE FLOOR Is called the SEARCH & EVAC GROUP ```
123
``` High Rise Office Buildings Pump PRESSURES FLOORS 1-10 11-20 21-30 31-40 41-50 ```
``` Floors 1-10 150psi 11-20 200psi 21-30 250psi 31-40 300psi 41-50 350psi ``` KEYWORD IS FIRE FLOOR
124
High Rise Office Building | FDNY strategic OPERATING PLAN for HI-RISE FIRES are,in order:
D VEG C ``` D determine fire floor V verify fire floor E evacuation simultaneously,as soon as possible G gain control of building system C confine/extinguish fire ```