BOOK 100 Hi rise IC Flashcards
(148 cards)
primary responsibility of the initial fire attack team is to …
locate, identify the emergency and determine the scope
when an actual fire is located, the officer of the attack team is designated the ?
division supervisor
a hi rise fire attack team takes specific equipment with them on an investigation what are they?
scba
forcible entry tools
hose packs
TIC
what unit is responsible for transport of equipment via stairwell in a Hi rise?
Ground support
how many feet shall BASE be from the building and not in proximity of the CP?
200 feet
list command staff?
PIO, safety, liaison
once fire attack begins in a hi rise, two members enter and two members remain where?
outside the IDLH
elevators used in a hi rise incident, shall not go higher than ? reported floor/lowest alarm floor
2.2
staging will normally be?
two floor below fire
who monitors the built in fire control, comms and elevator systems?
systems control unit
where is an appropriate location for RIC for rapid deployment?
staging or floor below the fire
who provides medical aid and transportation for injured and ill personnel?
medical unit
normally how many companies should be kept in base for each company held in staging?
2:1
how far is a safe location for the occupants during a hi rise incident?
200 feet
the command staff support staff are called?
assistants
what information should be relayed when the fire attack team has located the emergency?
location, nature and extent of the problem
what is the responsiblity of the second arriving company responsible for in a hi rise incident?
controlling elevators and vertical access routes
what are the basic requirements of the ICS has been met with the establishment of ?
fire attack, lobby control, staging and base
medical group super would recieve orders from and report to?
Operations
the time to consider for early relief on an actual hi rise fire is?
10-15 minutes
who is responsible for verifying water supply into the standpipe system at a hi rise?
lobby control
if an additional water supply is needed via the stairwell, who is responsible for providing a supply line to the entrance of the stairwell?
Base
the individual in charge of staging in a high rise fire is known as?
area manager
protecting the fire pump room from flooding and power loss is the responsibility of?
ground support unit