TB 162, Metrorail Construction Flashcards

(33 cards)

1
Q

A 46 inch water supply systemprovides cooling for the tunnel boring machine and water for firefighting operations. The system is equipped with 2 1/2 inch outlets every?

A

200 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The greatest risk in tunnel construction is?

A

Compromised atmospheres

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The fire department will respond to ? Portal entrances, during construction of the MRCTC project.

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A contractor maintains a hardwired mining phone system during totaling operations. It is equipped with the phone located at the following locations?

A

On the tunnel boring machine,
at the cross passages,
at the portals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If the atmosphere in the tunnel is compromised, entry is limited to?

A

US and R certified members wearing rebreather’s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Cal\OSHA requires that telling contractors provide rescue team personnel that meet specific training requirements if more then ? workers will be operating in the tunnel or shaft. LAFD has agreed to be the rescue team as we meet the requirement of having a rescue team on the site within? Minutes.

A

10

30

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For an EMS incident that occurred below grade,? Are required.

A

Full PPE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

By law, to provide a means for escape for me has just non-breathable atmosphere, all personnel who enter a mining site must wear?

A

A one hour self rescue device

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The direct fire attack inside the tunnel should only be justified if?

A

There is a possibility to save a life

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Members entering a compromised atmosphere under the conditions listed with the 60 minute bottle for limited to ? minutes working time.

A

12 minute

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Engineers pumping into fire department connections during construction jump rope a maximum of?

A

150 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The first unit on scene assignments his\her company to?

A

Lobby\systems control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The second arriving company establishes?

A

Staging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The agency in charge of an incident is?

A

The LAFD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The third company operates in the portal adjacent to the tunnel and is responsible for?

A

Technical support

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Fire protection systems found in the portals include all the following?

A

Fire detection devices,
extinguishing systems,
emergency lighting

17
Q

The tank in\tag out system used for identifying employees below grade is referred to as the brass board. The Brass board is located?

A

Adjacent to the entry portal

18
Q

Self rescue were respirators are maintained and stored at?

A

Each portal of entry

19
Q

The first alarm assignment is deployed to establish?

A

Base,
staging,
obtain initial observations

20
Q

The first arriving U.S. and R certified company establishes?

A

TUNNEL

division

21
Q

The responsibility for establishing rapid intervention is?

A

The back up entry team

22
Q

Which of the following methods of communication is not permitted in the tunnel?

A

Department issued cell phone

23
Q

Cal\OSHA has listed the metro regional connector transit Corredor project as potentially gassy due to the possibility of encountering methane gas. Hazard mitigation is been identified through?

A

Constant air monitoring,

use of ventilation system

24
Q

The third company of the first alarm assignment arriving at a tunnel construction incident establishes and is responsible for?

A

Technical support

25
The first unit on scene gives a radio size up, assumes the initial responsibility of incident commander, and assigns his/her company to?
Lobby/systems control
26
The second company of the first alarm assignment arriving Alta tunnel construction incident establishes?
Staging above round in proximity to the portal opening
27
Lobby/systems control is normally located?
In the contractors trailer
28
All of the following types of incidents within a non compromised atmosphere, members must wear an SCBA and a self rescue device ready for use?
EMS, injury, heart attack, electrocution Physical extrication from equipment Confined space rescue Collapse or flooding with rescue
29
An SCBA and a self rescue respirator is required for entry into a known compromised atmosphere, however personnel are limited to initial observation or atmospheric testing when which of the following conditions are met?
A two member team is in sight of the tunnel or shaft opening A four member team, if they will be ou of sight of the tunnel or shaft opening A back up team is standing by Entry into a compromised atmosphere does not exceed a distance of 500 feet
30
Radio communication in the tunnel with LAFD 800 MHz radios will be?
In the direct mode
31
A contractor hardware communication system is installed within the tunnel provides a telephone headset designed to maintain communications within the tunnel and above grade located.
At each portal or station box At each cross passage Every 1000 feet within the tunnel
32
All emergency operations will be discontinued and the tunnel evacuated should the tunnel atmosphere meet or exceed ? Lower explosive limit
20
33
The officer from the first arriving US&R certified company establishes ? In the portal, adjacent t the tunnel while the remainder of the company ?
Tunnel division | Prepares for tunnel operations