Drill #1 Flashcards
(2 cards)
0
Q
Evaluation
A
Time begins when apparatus stops.
Time ends when 2 personnel (on air) are at the nozzle and water is flowing from the nozzle.
Driver shall don SCBA in ready position at conclusion of drill.
Objective is completion in 50seconds or less.
1
Q
3 Position
A
Advance Hoseline
1 3/4” or 2 1/2” with Booster Tank Supply