Drill #3 Flashcards

(3 cards)

0
Q

3 Position

A
  1. Wrap Hydrant, signal when ready.
  2. Make Hydrant connection.
  3. Open Hydrant when ordered.
  4. Follow supply line, remove large kinks.
  5. Advance 2 1/2”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

2 1/2” (300 reverse bed) attack with Hydrant supply (150’ of 5”)

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Evaluation

A

Time begins when apparatus stops at hydrant.

Time ends when hydrant is supplying water, 2 personnel (on air) are at the nozzle and water is flowing.

Driver shall don SCBA in ready position at conclusion of drill.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly