Drill #3 Flashcards
(3 cards)
0
Q
3 Position
A
- Wrap Hydrant, signal when ready.
- Make Hydrant connection.
- Open Hydrant when ordered.
- Follow supply line, remove large kinks.
- Advance 2 1/2”
1
Q
2 1/2” (300 reverse bed) attack with Hydrant supply (150’ of 5”)
A
.
2
Q
Evaluation
A
Time begins when apparatus stops at hydrant.
Time ends when hydrant is supplying water, 2 personnel (on air) are at the nozzle and water is flowing.
Driver shall don SCBA in ready position at conclusion of drill.