Drill #2 Flashcards
(3 cards)
0
Q
3 Position
A
- Wrap Hydrant
- Make Hydrant Connection
- Open Hydrant when Ordered.
- Follow supply line to apparatus, remove large kinks.
- Advance to Nozzle
1
Q
Preconnect (1 3/4” or 2 1/2”) with Hydrant Supply (150’ of 5”)
A
.
2
Q
Evaluation
A
Time begins when apparatus stops at hydrant.
Time ends when hydrant is supplying water, 2 personnel (on air) are at the nozzle and water is flowing.
Driver shall don SCBA in ready position at conclusion of drill.