Month 3; Drill 3, 4 Person Flashcards
(4 cards)
0
Q
3 Position
A
- Wrap Hydrant
- Make Hydrant Connection
- Open Hydrant when ordered.
- Follow Supply Line, remove large kinks.
- Advance to Nozzle
1
Q
2 1/2” (300’ reverse bed) attack with Hydrant Supply (150’ of 5”)
A
.
2
Q
4 Position
A
- Go to rear of apparatus, signal driver to lay line.
- Assist Driver with 5” Supply Connection (Optional)
- Advance 2 1/2”
3
Q
Evaluation
A
Time begins when apparatus stops at hydrant.
Time ends when hydrant is supplying water, 2 personnel (on air) are at the nozzle and water is flowing.
Driver shall don SCBA in ready position at conclusion of drill.