Month 3; Drill 3, 4 Person Flashcards

(4 cards)

0
Q

3 Position

A
  1. Wrap Hydrant
  2. Make Hydrant Connection
  3. Open Hydrant when ordered.
  4. Follow Supply Line, remove large kinks.
  5. Advance to Nozzle
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

2 1/2” (300’ reverse bed) attack with Hydrant Supply (150’ of 5”)

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

4 Position

A
  1. Go to rear of apparatus, signal driver to lay line.
  2. Assist Driver with 5” Supply Connection (Optional)
  3. Advance 2 1/2”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Evaluation

A

Time begins when apparatus stops at hydrant.

Time ends when hydrant is supplying water, 2 personnel (on air) are at the nozzle and water is flowing.

Driver shall don SCBA in ready position at conclusion of drill.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly