Month 3; Drill #2, 4 Person Flashcards

(4 cards)

0
Q

3 Position

A
  1. Wrap Hydrant, signal when ready.
  2. Make Hydrant Connection
  3. Open Hydrant when ordered
  4. Follow Supply line to apparatus, remove large kinks
  5. Advance to Nozzle.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Preconnect (1 3/4” or 2 1/2”) with Hydrant Supply (150’ of 5”)

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

4 Position

A
  1. Go to rear of apparatus, signal driver to lay line.
  2. Assist Driver with supply connections (optional).
  3. Advance hose line.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Evaluation

A

Time begins when apparatus stops at hydrant.

Time ends when hydrant is supplying water, 2 personnel (on air) are at the nozzle and water is flowing.

Driver shall don SCBA in ready position at conclusion of drill.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly