Month 3; Drill #2, 4 Person Flashcards
(4 cards)
0
Q
3 Position
A
- Wrap Hydrant, signal when ready.
- Make Hydrant Connection
- Open Hydrant when ordered
- Follow Supply line to apparatus, remove large kinks
- Advance to Nozzle.
1
Q
Preconnect (1 3/4” or 2 1/2”) with Hydrant Supply (150’ of 5”)
A
.
2
Q
4 Position
A
- Go to rear of apparatus, signal driver to lay line.
- Assist Driver with supply connections (optional).
- Advance hose line.
3
Q
Evaluation
A
Time begins when apparatus stops at hydrant.
Time ends when hydrant is supplying water, 2 personnel (on air) are at the nozzle and water is flowing.
Driver shall don SCBA in ready position at conclusion of drill.