BUILDING SPRAY Flashcards
What is the operational limit for BSPs at low flow?
Do NOT operate BSPs for >60 seconds at <60gpm (60 for 60).
What is the required TSP weight for making the reactor critical?
TSP weight must be ≥18K and ≤28K lbs.
What is the basis for TSP weight limits?
Maintaining sump pH between 7.3-8.0 to prevent Cl SCC of steel and ensure sump precipitates.
What is the design basis of Building Spray?
Maintains RB pressure <55#, absorbs iodine, and controls sump pH by increasing it to 7.3-8.0.
What actions are required if BSP flow is <60gpm or >1400gpm?
Place pump in PTL and close BS-V-3; shut down BS in 24 hours to prevent challenging ECCS strainer.
What are the conditions for manual initiation of Building Spray?
RCS leak >500gpm, significant RB breach, TCLAD >1400°F, failed fuel >5%, RB pressure >5#, offsite child thyroid dose >5 Rem, or SAMG.
When can Building Spray be shut down?
Approaching 24 hours OR RB pressure <5# and RM-G-22/23 below High.
What is the minimum BSP pump flow required for adequate DHR flow?
<1400gpm BSP pump flow MUST be maintained.