REMOTE SHUTDOWN Flashcards

(11 cards)

1
Q

What is the Tech Spec requirement for “B” RSD indications?

A

Must have all “B” RSD indications OPERABLE. Restore in 30 days or be in HSBY in 6 hrs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the basis for Tech Spec 3.5.7 regarding “B” RSD indications?

A

Provides the ability to place the unit in Safe Hot Shutdown.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the zones under App R consideration for Remote Shutdown?

A

Main Control Room, Relay Room, ESAS Room.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where are the RSD panels and transfer switches located?

A
  • RSD Panels: CB 322’ near RCP Power Monitors.
  • “A” Transfer Switch: ESAS Room.
  • “B” Transfer Switch: 1S 480V Room.
  • “C” Transfer Switch: 322’ near RSD.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What happens to MU-P-1C and IC-P-1B during RSD transfer?

A

MU-P-1C controller in STOP on RSD panel B will TRIP if running prior to transfer. IC-P-1B in START position on Aux B panel will START.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the EF-V-30A/C and EF-V-B/D positions when transfer switches are used?

A

EF-V-30A/C are at 0%, and EF-V-B/D are at 25%.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is a High Impedance Fault?

A

Insulation breakdown without a dead short, where current still flows, causing MCC/bus overload.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is unique about the “C” RSD Transfer Switch?

A

It only has a switch for MU-P-1B.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How are RSD relays actuated?

A

RSD is ENERGIZE to actuate relays.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What manual actions are required to start EF-P-1 and EF-P-2A/B during RSD?

A
  • EF-P-1: Manually OPEN MS-V-13A/B.
  • EF-P-2A/B: Manually start at 1D/1E 4kV Breakers.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What happens to MUPs during RSD transfer?

A

RSD transfer of MUPs bypasses ES logic, so the pump will not auto start on ES.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly