What is the maximum allowable RCS activity for I-131?
≤ 0.35 μCi/g.
What is the maximum allowable RCS activity for Xe-133?
≤ 797 μCi/g.
Why must RCS dissolved gas be maintained below 100CC/kg?
To prevent accumulation in CRDM (Control Rod Drive Mechanisms).
What is the limit for unidentified RCS leakage per T.S. 3.1.6?
<1 gpm.
What is the limit for total RCS leakage per T.S. 3.1.6?
<10 gpm.
What is the limit for RCS leakage plus losses per T.S. 3.1.6?
<30 gpm.
What action is required if RCS leakage exceeds T.S. 3.1.6 limits?
Enter Hot Shutdown (HSD) within 24 hours.
What action is required for a non-isolable strength boundary leak?
Enter Hot Shutdown (HSD) and start cooldown (C/D) within 24 hours.
What is the limit for primary-to-secondary leakage in one OTSG?
<150 gallons per day (gpd).
What action is required if primary-to-secondary leakage exceeds 150 gpd in one OTSG?
Enter Hot Shutdown (HSD) within 6 hours and Cold Shutdown (CSD) within 36 hours.
What is required when Rx >2% power for RCS leak detection?
Two RCS leak detection methods with one sensitive to radioactivity must be operable. If RM-A-2 is INOP, sample RB every 8 hours and restore in 72 hours.
What is the pressurizer heat-up/cooldown rate limit?
Limited to 100°F/hr per T.S. 3.1.2.3.
What is the required pressurizer level for Rx to remain at 1% Δk/k?
Pressurizer level must be between 80-385 inches or go to HSD with CRD breakers open in 6 hours.
What is the volume per inch of the pressurizer?
12 gallons per inch.
What happens to pressurizer heaters at 80 inches or loss of ICS AUTO?
All heaters de-energize except those on 1P/1S.
What is the action if one ES power supply is INOP for pressurizer heaters?
Restore in 7 days or go to HSBY in 6 hours.
What is the action if two ES power supplies are INOP for pressurizer heaters?
Restore in 72 hours or go to HSBY in 6 hours.
What is the normal operational state of the PORV (RC-RV-2)?
Closed, except for LTOP operations.
What are the conditions for taking the PORV OOS when RCS <313°F?
HPI pumps racked out, MU-V-16s closed with breakers open, MU-V-217 closed, or Rx head off.
What is the PORV NDTT switch setpoint?
Hit the switch when RCS <565# and RCS <313°F.
What is the lift setting for code safeties (RC-RV-1A/B)?
2500# ±1%.
What is the function of the pressurizer spray valve (RC-V-1)?
Opens at 2205# to 40% and can be opened to 100% in manual but must be placed back in AUTO.
What is the purpose of the spray bypass flow?
Prevent thermal shock to the spray nozzle and equalize boron concentration within 50 ppm.
Where do RCS high point vents discharge?
Hot leg vents to RCDT, Rx vessel vents to containment atmosphere.