INCORES Flashcards

1
Q

SPND signals reliability

A

SPND signals are NOT reliable at temperatures >1000°F and should NOT be used at <15% power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Waiting time for incore readings after power change

A

Must wait 5 minutes after a power change to use incore readings and 10 minutes for calibration (Rh decay).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

T.S. 3.5-2 requirement for BIRO incore thermocouples

A

2 of 4 BIRO incore thermocouples per quadrant must be OPERABLE; restore in 7 days or be in HSD in 6 hours and CSD in 30 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Incore thermocouples requirement during RCS drain-down

A

2 incore thermocouples must be OPERABLE and in the core when RCS is drained down to below the tops of hot leg nozzles.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

T.S. 3.5.2.4 Quadrant Tilt action

A

Exceeding the tilt limit requires reducing reactor power by 2% for each 1% in excess of the tilt limit.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

T.S. 3.5.2.7 Axial Imbalance action

A

If an acceptable axial power imbalance is NOT achieved in 24 hours, reduce reactor power to ≤40% FP within 2 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

T.S. 3.5.2.8 Power map requirement

A

Must perform a power map within limits of COLR every 31 days.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

BIRO thermocouples operability requirement

A

With <2 BIRO thermocouples per quadrant OPERABLE, restore in 7 days or be in HSD in 6 hours and CSD in 30 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Importance of tilt and imbalance drawings

A

Know the tilt and imbalance drawings in Tech Specs to differentiate between conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly