What is the frequency for preparing a power map using the PPC and FIDMS per Tech Spec 3.5.2.8?

A

Every 31 EFPDs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the power supplies for the PPC?

A

Normal = 13.2kV via 1W switchgear thru OSF UPS, Backup = 1M 480V, Emergency = OSF UPS (Batteries).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What does “Delete from Scan” do in the PPC?

A

Removes the value from displays and calculations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What does “Delete from Monitor” do in the PPC?

A

Keeps the point displayed and used in calculations but removes it from the alarm screen.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the PPC plant modes?

A

Power Operations, Heat-Up/Cooldown (HU/CD), and Decay Heat.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the function of ERDS in the PPC?

A

Continuously sends PPC data to the NRC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What actions are required if PPC is O.O.S. for an extended period?

A

Perform hand calculations for Secondary Side Heat Balance, Ex-core calibration, Core Power Distribution, Shift and Daily Checks, RCS Leakrate, and Core Power Distribution Verification.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What happens when the FW flow correction factor is reset in PPC?

A

Calculated Heat Balance indicates HIGH, requiring Rx power reduction to maintain thermal power <2568MWt.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What must be done before shutting down both PPC servers?

A

Place ULD in HAND.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How does a new RCS leak affect the 2-hour calculation in PPC?

A

The calculation is initially non-conservative since it averages the last 2 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How often must tilt be manually checked if PPC and alarms are OPERABLE?

A

Every 7 days.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How often must tilt be manually checked if PPC and alarms are NOT OPERABLE?

A

Every 12 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How often must imbalance be calculated if PPC and alarms are OPERABLE?

A

Every 12 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How often must imbalance be calculated if PPC and alarms are NOT OPERABLE?

A

Every 1 hour.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly