CORE FLOOD (213) Flashcards

1
Q

When must CF-V-1A/B be OPEN during RCS heat-up?

A

When RCS pressure is >650# and <700#.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When must CF-V-1A/B be CLOSED during RCS cooldown?

A

When RCS pressure is <700# and >650#.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the maximum allowable pressure for Core Flood Tanks (CFTs) if RCS temperature is <313F and RC-RV-2 (PORV) is INOPERABLE?

A

CFTs must not exceed 590#.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the requirements for Core Flood Tanks to meet ECCS acceptance criteria?

A

Both Core Flood Tanks must be OPERABLE, along with 1 Train HPI and 1 Train LPI.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the operational parameters for Core Flood Tanks?

A

11.13-12.01ft water, 600±25# N2, and >2270ppm boron.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How long do you have to restore boron concentration in Core Flood Tanks if it is out of specification?

A

Restore boron concentration within 72 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the Tech Spec action for Core Flood Tank volume or pressure being out of specification?

A

Enter 1-hour 3.0.1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What ensures ECCS criteria are met if the CF injection line breaks?

A

The Core Flood nozzle venture limits reactor vessel flow OUT.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the power source for CF-V-1s, and what is required at 100% power?

A

CF-V-1s are powered by 1C ESV, and breakers must be OPEN with EST applied at 100% power, or else 3.0.1 applies.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What happens to CF-V-2A/B on 4# RB and RTI?

A

They CLOSE and are powered by 1A ESV MCC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What happens to CF-V-20A/B on 4# ES and RTI?

A

They CLOSE and are powered by 1F DC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the status of CF-V-3A/B during normal operations?

A

They are CLOSED with breakers OPEN except while venting or else 3.0.1 applies.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the power source for CF-V-19A/B, and what is their function?

A

Powered by 1M DC, they CLOSE on 4# RB and RTI, with the inside containment valve being a check valve only.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the requirement for CF-V-3A/B during normal operations?

A

They must be LOCKED OPEN with an EST and are powered from “A” RW MCC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the normal fill supply for Core Flood Tanks?

A

The 4% boric acid tank, with MU supplies used during outages (blanked at power).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When is a Core Flood Tank considered OPERABLE with one indication OOS?

A

If either 1 level indication or 1 pressure indication is OPERABLE (redundant).