CORE FLOOD (213) Flashcards
When must CF-V-1A/B be OPEN during RCS heat-up?
When RCS pressure is >650# and <700#.
When must CF-V-1A/B be CLOSED during RCS cooldown?
When RCS pressure is <700# and >650#.
What is the maximum allowable pressure for Core Flood Tanks (CFTs) if RCS temperature is <313F and RC-RV-2 (PORV) is INOPERABLE?
CFTs must not exceed 590#.
What are the requirements for Core Flood Tanks to meet ECCS acceptance criteria?
Both Core Flood Tanks must be OPERABLE, along with 1 Train HPI and 1 Train LPI.
What are the operational parameters for Core Flood Tanks?
11.13-12.01ft water, 600±25# N2, and >2270ppm boron.
How long do you have to restore boron concentration in Core Flood Tanks if it is out of specification?
Restore boron concentration within 72 hours.
What is the Tech Spec action for Core Flood Tank volume or pressure being out of specification?
Enter 1-hour 3.0.1.
What ensures ECCS criteria are met if the CF injection line breaks?
The Core Flood nozzle venture limits reactor vessel flow OUT.
What is the power source for CF-V-1s, and what is required at 100% power?
CF-V-1s are powered by 1C ESV, and breakers must be OPEN with EST applied at 100% power, or else 3.0.1 applies.
What happens to CF-V-2A/B on 4# RB and RTI?
They CLOSE and are powered by 1A ESV MCC.
What happens to CF-V-20A/B on 4# ES and RTI?
They CLOSE and are powered by 1F DC.
What is the status of CF-V-3A/B during normal operations?
They are CLOSED with breakers OPEN except while venting or else 3.0.1 applies.
What is the power source for CF-V-19A/B, and what is their function?
Powered by 1M DC, they CLOSE on 4# RB and RTI, with the inside containment valve being a check valve only.
What is the requirement for CF-V-3A/B during normal operations?
They must be LOCKED OPEN with an EST and are powered from “A” RW MCC.
What is the normal fill supply for Core Flood Tanks?
The 4% boric acid tank, with MU supplies used during outages (blanked at power).
When is a Core Flood Tank considered OPERABLE with one indication OOS?
If either 1 level indication or 1 pressure indication is OPERABLE (redundant).