What is the RCS activity limit for I-131 and Xe-133?

A

≤ 0.35 μCi/g I-131 and ≤797 μCi/g Xe-133 to limit offsite dose following SGTR and MSLB.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the minimum BWST volume required?

A

350,000 gallons.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the boron concentration and temperature requirements for the BWST?

A

Boron > 2500 ppm and temperature > 40°F.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the LCO for MU-T-1 restricted region?

A

72-hour LCO.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What action is required for MU-T-1 prohibited region?

A

Immediate entry into 3.0.1 to prevent gas entrainment of pumps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the volume per inch for MU-T-1?

A

30 gallons per inch.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the minimum and maximum flow through MU demineralizers?

A

Minimum flow is 25 gpm, and maximum flow is 123 gpm.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What happens to a non-ES selected MUP if both normal 4kV feeder breakers are OPEN?

A

The MUP will trip and does NOT look at diesel breakers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Can two MU pumps be run on the same bus?

A

No, you can’t run two MU pumps on the same bus.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What must be done during venting of MU-T-1?

A

One WDG-P-1A/B compressor must be running in HAND.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What happens to MU-V-2A/B on loss of VBA?

A

RM-L-1 letdown rad monitor interlocks CLOSE MU-V-2A/B.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What action is required on high RM-L-1?

A

Evacuate RCA per C-1-1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What must be ensured before isolating demins?

A

Ensure the demin bypass valve is OPEN to prevent lifting relief valves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What happens to MU-V-8 when MU-T-1 level drops below 18”?

A

MU-V-8 goes to THRU position for MUP NPSH.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the function of MU-V-18 during testing after a valid ES signal?

A

MU-V-18, powered from 11M DC, will CLOSE after 20 seconds.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the limit for letdown flowrate changes?

A

Changes should be limited to 2.5 gpm/min to prevent thermal stress in Letdown Coolers.

17
Q

What happens to MU-V-25/26 on A/B 30# ES?

A

MU-V-25/26 CLOSE.

18
Q

Which valve fails OPEN on loss of IA?

A

MU-V-32 is the only valve to fail OPEN on loss of IA.

19
Q

What alignment is required for 1M DC during HPI line rupture concurrent with loss of DC?

A

Align 1M DC to the side with OPEN cross-connects.

20
Q

What is required for HPI Flow Transmitter operability?

A

It must be OPERABLE for the train if that HPI train is providing seal injection; otherwise, enter a 72-hour LCO.

21
Q

What is the maximum HPI flow rate to prevent pump runout?

A

HPI must be throttled to <515 gpm, including flow through MU-V-16s, SI (32 gpm), and Recirc (95 gpm).

22
Q

What must remain CLOSED while in piggyback mode?

A

MU-V-36/37 must remain CLOSED to prevent rupturing MU-T-1.

23
Q

What happens to MUPs following a LOOP?

A

No MUP will restart on Diesel (not ES selected); start MU-P-1A IAW AOP-41 to restore Seal Injection.

24
Q

What steps are required for restoration of LD if RM-L-1 alarmed or ES?

A

Verify integrity of MU-T-1, RM-G-22/23 not alarmed, and RM-A-6/8 or portable in-service to detect release.

25
What action is required if MU-T-1 <18" and only 1 MU-V-14 is OPEN (or both closed)?
Put MUPs in PTL. If IC-Ps have tripped, also ensure RCPs are tripped.
26
What happens to MU-V-18 on ES?
MU-V-18 closes to ensure sufficient HPI flow to the core on MU line break downstream of MU-V-18 in RB.
27
What action is required if MU-FI-1126 HPI flow injection for MU-V-16A is INOPERABLE with MU-P-1B providing normal SI?
Close the cross-connects.