REACTOR PROTECTION SYSTEM (RPS) Flashcards

1
Q

What happens if RC-P-1A trips and VBA is lost?

A

A reactor trip occurs because RPS sees no pumps operating in the same loop for flux to pumps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What components make up the Reactor Trip Module (RTM)?

A

Channel trip relay, 2 of 4 logic, output logic relays, and manual bypass relays.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the required action if RPS minimum degree of redundancy is not met?

A

Restore redundancy within 1 hour or be in Hot Shutdown (HSD) in 6 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

During continuous rod withdrawal, which RPS setpoint is hit first?

A

The RPS pressure setpoint.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What happens if NI-6 fails high during startup and rod testing?

A

RPS Channel “B” trips on high power, with the flux trip set to 5%.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What occurs if Loop A RCS flow fails to 0 lbm/hr?

A

An RPS channel trip is triggered.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly