VENTILATION - REACTOR BUILDING Flashcards

1
Q

What happens to AH-E-6A/B purge supply on AH-E-7 trip?

A

AH-E-6A/B purge supply trips to prevent pressurizing RB, and discharge dampers close.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What conditions must be met to start AH-E-7A/B exhaust?

A

AH-D-82 (MU damper) must be unblanked, and the emergency purge damper must be blanked.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the limit for purge valve (AH-V-1A/B/C/D) opening when not in CSD or RSD?

A

Purge valves are limited to 30° to ensure closure during LBLOCA per T.S. 3.6.9.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What happens if purge valves are fully open at temperatures below 200°F?

A

AH-E-7 trip does not close the purge valves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Can RB purge be used for temperature or humidity control?

A

No, RB purge cannot be used for temperature or humidity control but can be used for pressure and radiation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When can RB purge be started before an outage?

A

RB purge can be started up to 24 hours before an outage.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the restoration timeline if purge valves are INOP due to excessive leakage?

A

Restore in 48 hours or manually close both valves and restore operable in 72 hours, or maintain administratively closed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the restoration timeline if purge valves are INOP for reasons other than leakage?

A

Close the valves in 24 hours and maintain until operable. If neither valve is operable, restore one valve in 24 hours or go to HSD.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What happens to RB purge if VBA is lost?

A

RB purge terminates due to RM-A-9 interlock.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What triggers AH-E-101 to trip?

A

AH-E-101 trips on manual or auto actuation of kidney filter fire.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What must be done before manually starting FS-P-5A/B?

A

AH-E-101 must be stopped first.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How long does AH-E-101 take to circulate one RB volume?

A

AH-E-101 circulates one RB volume in 2 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Where is the FS-P-5A/B control panel located?

A

Outside the RB personnel hatch.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What triggers FS-P-5A/B to auto-start?

A

FS-P-5A/B auto-starts when two temperature switches exceed 200°F.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What must be done after FS-P-5A/B auto-starts due to temperature switch actuation?

A

They must be manually stopped after the temperature switch is reset.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the LCO for one RR-P-1 being out of service?

A

72-hour LCO.

17
Q

What is the design basis for ECCS cooling?

A

3 AH-E-1s OR 2 BS-Ps OR 1 BS and 1 AH-E-1.

18
Q

What is required for AH-E-1 cooler operability?

A

Rx River must be circulating through the fan.

19
Q

What happens if one AH-E-1 fan is out of service?

A

No LCO is required.

20
Q

What happens if two AH-E-1 fans are out of service?

A

A 7-day LCO applies.

21
Q

What opens RR-V-10A/B?

A

RR-V-10A/B opens on pump start (52 breaker contacts).

22
Q

What signal opens RR-V-1A/B?

A

RR-V-1A/B gets an open signal on Block 1.

23
Q

What is the operability limit for RR-P-1 strainer differential pressure?

A

RR-P-1 is inoperable if strainer DP exceeds 6#.

24
Q

What is the function of RR-V-6?

A

RR-V-6 maintains 55# on coils for RB environment post-LOCA and is limited to 60% open.

25
What is the LCO for RR-V-5/6 operability?
72-hour LCO.
26
What are the temperature limits for normal RB cooling?
RB average air temperature above 320' must be <130°F, and below 320' must be <120°F.
27
What is the action if RB cooling temperature limits are exceeded?
Restore within 8 hours or go to HSBY in 6 hours.
28
What happens to AH-E-1C on an ES actuation?
AH-E-1C always trips on A or B ES and only restarts in slow speed if the respective train it is powered from has an ES actuation signal.
29
What is required to use the REMOTE/SLOW 43 switch for AH-E-1s?
MCR control must be out of PTL, and the fan cannot be running in fast speed.
30
What is the reactor pressure limit for criticality?
The reactor shall not be critical if RB pressure is >2# or <1# vacuum.
31
Why are fans run in slow speed if RB pressure exceeds 2#?
To prevent motor overload.
32
What is the heat sink for industrial coolers?
The atmosphere.
33
What triggers spray pumps and heaters in industrial coolers?
They trip on low sump level at 20" (15" for 1B) and turn ON at 40°F (40-45°F for 1B).
34
What happens to RB-V-2A during Block 1 ESAS?
RB-V-2A (cooling supply) closes, powered by 1C ESV.
35
What happens to RB-V-7 during ESAS?
RB-V-7 closes, powered by 1B ES MCC.
36
How does starting 2 RCPs during plant heatup affect RB pressure?
It increases RB pressure due to extra heat generated.
37
What happens to AH-E-1C during ES actuation where the "B" train fails to actuate?
AH-E-1C trips on either train of ES and only restarts in slow speed if the train it is powered by receives an ES signal.
38
What condition requires entry into a T.S. LCO?
AH-V-1A outside leakage limits.