What happens to AH-E-6A/B purge supply on AH-E-7 trip?
AH-E-6A/B purge supply trips to prevent pressurizing RB, and discharge dampers close.
What conditions must be met to start AH-E-7A/B exhaust?
AH-D-82 (MU damper) must be unblanked, and the emergency purge damper must be blanked.
What is the limit for purge valve (AH-V-1A/B/C/D) opening when not in CSD or RSD?
Purge valves are limited to 30° to ensure closure during LBLOCA per T.S. 3.6.9.
What happens if purge valves are fully open at temperatures below 200°F?
AH-E-7 trip does not close the purge valves.
Can RB purge be used for temperature or humidity control?
No, RB purge cannot be used for temperature or humidity control but can be used for pressure and radiation.
When can RB purge be started before an outage?
RB purge can be started up to 24 hours before an outage.
What is the restoration timeline if purge valves are INOP due to excessive leakage?
Restore in 48 hours or manually close both valves and restore operable in 72 hours, or maintain administratively closed.
What is the restoration timeline if purge valves are INOP for reasons other than leakage?
Close the valves in 24 hours and maintain until operable. If neither valve is operable, restore one valve in 24 hours or go to HSD.
What happens to RB purge if VBA is lost?
RB purge terminates due to RM-A-9 interlock.
What triggers AH-E-101 to trip?
AH-E-101 trips on manual or auto actuation of kidney filter fire.
What must be done before manually starting FS-P-5A/B?
AH-E-101 must be stopped first.
How long does AH-E-101 take to circulate one RB volume?
AH-E-101 circulates one RB volume in 2 hours.
Where is the FS-P-5A/B control panel located?
Outside the RB personnel hatch.
What triggers FS-P-5A/B to auto-start?
FS-P-5A/B auto-starts when two temperature switches exceed 200°F.
What must be done after FS-P-5A/B auto-starts due to temperature switch actuation?
They must be manually stopped after the temperature switch is reset.
What is the LCO for one RR-P-1 being out of service?
72-hour LCO.
What is the design basis for ECCS cooling?
3 AH-E-1s OR 2 BS-Ps OR 1 BS and 1 AH-E-1.
What is required for AH-E-1 cooler operability?
Rx River must be circulating through the fan.
What happens if one AH-E-1 fan is out of service?
No LCO is required.
What happens if two AH-E-1 fans are out of service?
A 7-day LCO applies.
What opens RR-V-10A/B?
RR-V-10A/B opens on pump start (52 breaker contacts).
What signal opens RR-V-1A/B?
RR-V-1A/B gets an open signal on Block 1.
What is the operability limit for RR-P-1 strainer differential pressure?
RR-P-1 is inoperable if strainer DP exceeds 6#.
What is the function of RR-V-6?
RR-V-6 maintains 55# on coils for RB environment post-LOCA and is limited to 60% open.